Why making it easy when you can make it the hard way. The roll of insulation material was 1m wide or about 40" and I wanted 1 solid pieces in centre of the roof. It was bit tricky to get there as its kind of stiff. But I got it there. With the plastic protection on the backside still in place. It was alot easier to peal it of once in place then pealing it of in advance and then trying to get the piece in place.
Pealing of the glue protection while it was still in place.
Forgot to take pictures of the rear wall, while applying sound insulation there but it turned out to be so tight behind the gas tank so I got to skip the 8 mm sound insulation just behind the gas tank or I wouldn't have gotten the gas tank in place.
Trimming in progress of the floor pieces.
Of course it is really necessary to chamfer the insulation so that the carpet will get the best possible environment to fall in place nice.
About halfway done.